Friday, April 26, 2024

British newest aircraft carrier returns to Rosyth for planned maintenance

The Royal Navy has announced on 3 April that the newest aircraft carrier, called the HMS Queen Elizabeth, returned to Rosyth for planned maintenance.

The 65,000 tonne carrier was floated in July 2014 and sailed from Rosyth Dockyard for the first time in June 2017.

Since then she has crossed the Atlantic to conduct historic trials with F35B Lightning II test fighter jets in the USA and worked up towards her official in-service date of 2020.

- ADVERTISEMENT - CONTINUE READING BELOW -

Sailing back into Scottish waters, her Commanding Officer, Captain Nick Cook-Priest said: “A lot of water has already passed under our keel since we left Rosyth in 2017.

“Our return here is yet another first for HMS Queen Elizabeth and another important step on her journey as Britain generates a big deck Carrier Strike capability,” said Captain Nick Cook-Priest RN.

Having lowered her pole mast to get under the three Bridges, the ship will now have to wait for the right tidal and weather conditions to manoeuvre safely through the lock into Rosyth Dockyard.

Equipped with a specially designed roller-fender system, there will be just one metre clearance each side of the ship, and just over one metre separating the keel from the entrance sill.

She will then be taken through the inner basin, back into the dry dock where she was pieced together, edging past her younger sister, HMS Prince of Wales which is scheduled to leave Rosyth for the first time later this year.

This dry-docking period is a mandatory requirement in accordance with Lloyds Register classification. An inspection will be carried out on her 920 foot-long hull, with any defects being rectified and marine growth removed.

The head of Marine Engineering onboard, Cdr Mark Hamilton says it’s a significant, but necessary job: “This routine maintenance will include changing many of the large underwater valves, inspecting the rudders, propellers and stabilisers, as well as cleaning and touching up the underwater paint scheme.

“Having completed this work, HMS Queen Elizabeth should not have to dry dock again for another six years.”

When the docking period is complete HMS Queen Elizabeth will sail to conduct further sea trials and training ahead of deploying again later this year for ‘WESTLANT 19’, where she will embark British F35B Lightning II jets to conduct Operational Testing, following on from last year’s successful Developmental Tests.

She will deploy operationally for the first time in 2021.

If you would like to show your support for what we are doing, here's where to do it.

If you wish to report grammatical or factual errors within our news articles, you can let us know by using the online feedback form.

Executive Editor

About author:

Dylan Malyasov
Dylan Malyasov
Dylan Malyasov is the editor-in-chief of Defence Blog. He is a journalist, an accredited defense advisor, and a consultant. His background as a defense advisor and consultant adds a unique perspective to his journalistic endeavors, ensuring that his reporting is well-informed and authoritative. read more

YOU MIGHT ALSO LIKE

TRENDING NOW

Ukrainian military receives new batch of Kozak armored vehicles

Ukrainian Defense Minister Rustem Umeryov, alongside Chief of the General Staff of the Armed Forces Anatoliy Bargilevych, hands over domestically produced "Kozak" armored vehicles...