U.S. Army to order prototypes of next-generation squad automatic weapon

The U.S. Army is preparing to order prototypes of the Next Generation Squad Weapon programme, both chambered in the Army’s new specification general purpose 6.8mm round.

In a recent notice posted on the Federal Business Opportunities website, the service asked industry proposals in regards to a Prototype Project Opportunity Notice (PPON) for Next Generation Squad Weapons (NGSW).

The U.S. Army has released a Prototype Project Opportunity Notice (PPON) for both its the Next Generation Squad Weapon-Rifle (NGSW-R) and the Next Generation Squad Weapon-Automatic Rifle (NGSW-AR) as it considers replacing the M249 squad automatic weapon and M4/M4A1 carbine.

- ADVERTISEMENT - CONTINUE READING BELOW -

Published on 30 January, the PPON said the army intends to award up to three prototype Other Transaction Agreements (OTAs) under the authority of 10 U.S.C. § 2371b, with each COMPANY developing two weapon variants under the NGSW program and 6.8 millimeter ammunition common to both weapons.

The weapons include the Next Generation Squad Weapon-Rifle (NGSW-R) and the Next Generation Squad Weapon-Automatic Rifle (NGSW-AR). The NGSW-R is the planned replacement for the M4/M4A1 Carbine and the NGSW-AR is the planned replacement for the M249 Squad Automatic Weapon (SAW) in the Automatic Rifleman Role in the Close Combat Force.

Deliverables for each prototype OTA include 53 NGSW-R weapons, 43 NGSW-AR weapons, 845,000 rounds of ammunition, spare parts, test barrels, tools/gauges/accessories, engineering support, and iterative prototyping efforts as defined in the Statement of Work. Each prototype OTA will undergo two prototype test events including Soldier Touch Points. The duration for each prototype OTA is estimated to be up to eight years. The first 27 months will be for prototyping the NGSW-R, NGSW-AR, and ammunition. Following this prototyping effort, there may be additional iterative prototyping efforts for the NGSW-R, NGSW-AR, and ammunition. These iterative prototyping efforts will each have separate durations and will occur within the eight year duration.

The U.S. Army Contracting Command have said that written proposals for the PPON have a deadline of 24th April 2019, and bid samples are due on 30th May 2019.

Also noted that the production awards may include 250,000 total weapons systems (NGSW-R, NGSW-AR, or both), 150,000,000 rounds of ammunition, spare parts, tools/gauges/accessories, and engineering support. The value of this follow-on production awards is estimated to be $10M in the first year and estimated $150M per year at the higher production rates.

Readers who wish to follow our weekly coverage can subscribe to the Weekly Defense Roundup.

If you wish to report a grammatical or factual error in this article, please let us know by using the online form.

Executive Editor

Support The Defence Blog

Independent reporting takes resources. Join us on Patreon.

Become a patron

More Like This

Greece is arming up with U.S.-made kamikaze drones

The U.S. State Department approved a possible sale to Greece of Switchblade 300 Block 20 systems, a portable loitering munition built by AeroVironment (AV)...

U.S. Air Force wants ground launcher for drones and missiles

The U.S. Air Force Life Cycle Management Center's Command, Control, Communications, and Battle Management Directorate at Wright-Patterson Air Force Base in Ohio published a...

Chinese spy vessels cross U.S. waters on the way to the Arctic

Two Chinese research ships pushed north through American waters off Alaska this week, and for the first time this year, they didn't just skirt...

Unknown U.S. Navy drone boat spotted leaving Virginia base under escort

A U.S. Navy security boat escorted an unfamiliar uncrewed vessel out of Naval Amphibious Base Little Creek, and the open-source account Aviation and Naval...

U.S.-based aerospace firm X-Bow Systems heads to Farnborough

U.S.-based aerospace firm X-Bow Systems announced it will exhibit at the Farnborough International Airshow, running July 20 through 24 in Hampshire, England, setting up...

Russia’s cutting-edge drone upgrade is a $2 camping compass

Somewhere in a Russian drone factory, an engineer looked at a satellite-jamming crisis that has cost the Kremlin countless drones and countless rubles, and...