US Air Force awards contract to Boeing for new command-and-control aircraft

The U.S. Department of the Air Force awarded Boeing a contract to begin work on the  E-7A battle management and command-and-control aircraft Feb 28.

The Air Force said in a release that the value of this initial contract would not exceed $1.2 billion.

The DAF selected the E-7A to replace the E-3 Airborne Warning and Control System. The E-7A will provide advanced Airborne Moving Target Indication and Battle Management, Command and Control capabilities, and advanced Multi-Role Electronically Scanned Array radar that enhances airborne battle management and enables long-range kill chains with potential peer adversaries.

- ADVERTISEMENT - CONTINUE READING BELOW -

In fiscal year 2022, the DAF selected the E-7A to replace the E-3 AWACS and established an E-7A Program Management Office. The DAF is using the rapid prototyping acquisition pathway to acquire the first two E-7As.

“The E-7A will be the department’s principal airborne sensor for detecting, identifying, tracking, and reporting all airborne activity to Joint Force commanders,” said Andrew Hunter, assistant secretary of the Air Force for Acquisition, Technology and Logistics. “This contract award is a critical step in ensuring that the department continues delivering battlespace awareness and management capabilities to U.S. warfighters, allies and partners for the next several decades. The E-7A will enable greater airborne battlespace awareness through its precise, real-time air picture and will be able to control and direct individual aircraft under a wide range of environmental and operational conditions.”

The USAF plans to begin production in fiscal 2025, with the first E-7A expected to be fielded by fiscal 2027. The service anticipates procuring 24 additional E-7As by fiscal 2032. The E-7A total aircraft inventory is projected to be 26.

The ongoing modernization of the E-3 AWACS meets the intent of the 2022 National Defense Strategy by continuing worldwide Battle Management, Command and Control and Airborne Moving Target Indication Operations as required by the DAF.

“We conducted a thorough analysis of viable industry options to ensure the selected E-3 replacement could meet the specific needs of the U.S. Until the E-7A is fielded, we will continue to rely on the E-3 AWACS,” Hunter said. “The rapid prototyping program will integrate U.S.-based mission systems into the existing airborne platform to meet DAF requirements while simultaneously ensuring interoperability with coalition and allied partners already operating the E-7A.”

Readers who wish to follow our weekly coverage can subscribe to the Weekly Defense Roundup.

If you wish to report a grammatical or factual error in this article, please let us know by using the online form.

Executive Editor

Support The Defence Blog

Independent reporting takes resources. Join us on Patreon.

Become a patron

More Like This

U.S. Air Force buys more Norwegian-made stealth missile

The U.S. Air Force awarded Kongsberg Defence & Aerospace, the Norwegian company that builds the weapon, $98.4 million to produce the next batch of...

U.S. Air Force wants 16,450 more long-range missiles, and fast

The U.S. Air Force has told its biggest missile maker to build thousands more long-range weapons than it planned even a week ago, and...

U.S. Air Force conducts live-fire test for its unmanned fighter jet

An unmanned fighter jet just fired a live air-to-air missile at a target over the California desert, and a human sitting somewhere else gave...

U.S. Air Force taps consulting giant for secretive quantum research

The next major shift in military technology might not look like a stealth fighter or a hypersonic missile. It could look like a laboratory...

U.S. Air Force seeks a new engine for rockets that fly like jets

The U.S. Air Force has asked American rocket companies for their best ideas on an engine that could let a single missile take off...