Friday, March 29, 2024

BAE Systems delivers its 3,000th vehicle management computer for F-35

BAE Systems, a global leader in electronic warfare, announced on Friday the delivery of its 3,000th vehicle management computer (VMC) and 1,000th active inceptor system (AIS)  to Lockheed Martin for the F-35 Lightning II aircraft. 

According to a company news release, the VMC and AIS are flight-critical systems that provide each F-35 jet with the ability to operate safely and reliably in demanding environments, with decreased pilot workload and enhanced mission effectiveness.

“At BAE Systems, we are dedicated to supporting our warfighters with the most advanced systems and technologies,” said Ehtisham Siddiqui, vice president and general manager of Controls and Avionics Solutions at BAE Systems. “These two milestones underscore our partnership with Lockheed Martin to consistently deliver proven flight-critical and mission-critical systems on time for the F-35 aircraft.”

- ADVERTISEMENT - CONTINUE READING BELOW -

The VMC unit provides advanced hardware and computing for the F-35’s digital fly-by-wire flight control system and utility systems (fuel, electrical, and hydraulic system controls), which maximize system integration to improve mission efficiency and safety. BAE Systems has successfully reached full-rate production – increasing deliveries from 10 shipsets per month to 25 shipsets per month to achieve program requirements.

BAE Systems has also reached full-rate production at a level of 19 shipsets per month for its active inceptors, which are used by the pilot to direct and maneuver the aircraft. The AIS consists of the inceptor control unit, active side stick controller, and active quadrant throttle assembly. The high-integrity inceptors provide pilots with tactical feedback through active technology for increased situational awareness, safety, and mission survivability.

The company continues to invest in equipment, testing, and infrastructure upgrades for best-in-class manufacturing efficiency and aftermarket support. These improvements contributed to a 100 percent quality rating in both VMC and AIS production for 2020 from Lockheed Martin. Work for the VMC and AIS occurs at BAE Systems facilities in Endicott, New York and Rochester, UK, respectively.

If you would like to show your support for what we are doing, here's where to do it.

If you wish to report grammatical or factual errors within our news articles, you can let us know by using the online feedback form.

Executive Editor

About author:

Dylan Malyasov
Dylan Malyasov
Dylan Malyasov is the editor-in-chief of Defence Blog. He is a journalist, an accredited defense advisor, and a consultant. His background as a defense advisor and consultant adds a unique perspective to his journalistic endeavors, ensuring that his reporting is well-informed and authoritative. read more

YOU MIGHT ALSO LIKE

TRENDING NOW

Ukraine uncovers secrets of Russia’s new hypersonic missile

Ukrainian analysts have unveiled the classified specs of Russia's shadowy hypersonic cruise missile, the 3M22 Zircon, intercepted by US-made missile defense systems over Kyiv,...